Project case study
Basement Drywall & Finishing in Markham
An unfinished basement turned into a family room and home office with new drywall, a Level 4 finish, vinyl plank flooring and fresh paint.

The work
The brief
The framing and electrical were already approved; the family needed a reliable team to close up the walls and finish the space quickly.
The work
- Hung moisture-resistant drywall on walls and ceilings, with access panels for valves
- Taped and finished to Level 4 for a smooth painted result
- Installed waterproof vinyl plank flooring over a vapour-barrier underlay
- Primed and painted walls, ceilings and trim
The result
Roughly 700 sq ft of comfortable, finished living space delivered in three weeks.
Related projects
View all projects
Tile Installation Bathroom Tile Renovation in Islington Village
A dated main bathroom stripped to the studs and finished with large-format porcelain floor tile, a full-height shower…
View case study
Flooring Main-Floor Hardwood Installation in Mississauga
Worn carpet and laminate replaced with continuous engineered hardwood across the living, dining and hallway areas, with…
View case study
Stucco & Exterior Stucco Repair & Exterior Refresh in Woodbridge
Cracked and stained stucco repaired, foundation parging renewed and the full façade recoated for a uniform…
View case study


